PERENCANAAN WAKTU PROYEK PEMBANGUNAN GEDUNG KAMPUS I UKI TORAJA DENGAN PRIMAVERA PROJECT PLANNER. (2017). Journal Dynamic Saint, 2(2), 314-325. https://doi.org/10.47178/dynamicsaint.v2i2.102