“ANALISA PERENCANAAN WAKTU RUKO BOLU GREEN TORAJA UTARA DENGAN MENGGUNAKAN METODE CRITICAL PATH METHOD” (2019) AgroSainT, 5(3), pp. 162–169. doi:10.47178/agro.v5i3.680.